To-do
18 items left · 1 done. Tap the box to mark done.
Plumbing rough-in inspection — Level 3
Rough-in · Aisha Bello · due 1970-01-03
Electrical rough-in inspection — Level 3
Rough-in · Aisha Bello · due 1970-01-04
Tile mock-up sign-off — primary bath
Finishes · Marcus Chen · due 1970-01-06
Asbestos clearance — confirm uploaded
Demo · Renata Oliveira · due 1969-12-29
Underfloor data certification — Zone A
MEP · Tom Reilly · due 1970-01-02
Submit life-safety revision response
Permit · Marcus Chen · due 1970-01-01
Re-inspect ceiling grid — Rooms 401–406
Ceilings · Aisha Bello · due 1970-01-02
Hood counterflashing complete
Roofing · Tom Reilly · due 1970-01-03
Grease interceptor city inspection
Plumbing · Aisha Bello · due 1970-01-05
Caisson pour P5–P8
Foundation · Renata Oliveira · due 1970-01-07
Re-grade access road switchback
Sitework · Tom Reilly · due 1970-01-04
Pre-pour rebar inspection Bldg B podium
Foundation · Aisha Bello · due 1970-01-03
Re-torque HDU8 hold-downs L3
Framing · Tom Reilly · due 1970-01-02
Land isolated ground bar at MDP
Electrical · Renata Oliveira · due 1970-01-04
Med gas certification — Phase 1
Plumbing · Aisha Bello · due 1970-01-06
Terrazzo grind and seal
Flooring · Tom Reilly · due 1970-01-08
Millwork install — feature wall
Finishes · Renata Oliveira · due 1970-01-11
Stripe parking + dock lanes
Sitework · Tom Reilly · due 1970-01-05
ESFR sprinkler final acceptance
Fire · Aisha Bello · due 1970-01-07